Material Requirements Planning (MRP) aims to increase manufacturing efficiency by managing the
- production schedule,
- reducing inventory,
- increasing cash flow, and
- delivering products in a timely manner.
ERP is a technical subset of MRP.
Material Requirements Planning (MRP) aims to increase manufacturing efficiency by managing the
ERP is a technical subset of MRP.
Related Articles | |
Just in Time | ■■■■■■ |
Just in Time (JIT) is the cornerstone philosophy of Lean Manufacturing and MRP. - ; - Using the just-in-time . . . Read More | |
Plan at top500.de | ■■■■■ |
Plan: A plan is typically any diagram or list of steps with timing and resources, used to achieve an . . . Read More | |
Auto at top500.de | ■■■■ |
In the industrial context, "auto" is a short form of "automobile" or "automotive" which refers to the . . . Read More | |
Acronym at top500.de | ■■■■ |
- An acronym is a type of abbreviation formed from the first components of a word or phrase. There are . . . Read More | |
Architecture at top500.de | ■■■■ |
Architecture (Latin architectura) is both the process and the product of planning, designing, and constructing . . . Read More | |
Engineer at top500.de | ■■■■ |
In the industrial/industry context, an engineer is a professional who applies scientific and mathematical . . . Read More | |
Efficiency at top500.de | ■■■■ |
; - Efficiency is the (often measurable) ability to avoid wasting materials, energy, efforts, money, . . . Read More | |
Move at top500.de | ■■■■ |
Move: In the industrial, industry context, "move" refers to the act of transferring or relocating a product, . . . Read More | |
Vendor at top500.de | ■■■■ |
In a supply chain, a vendor, or a seller, is an enterprise that contributes goods or services. Generally, . . . Read More | |
Accumulation at top500.de | ■■■■ |
- "Accumulation" generally refers to the process of collecting or gathering items or data over time; . . . Read More |